Laying Utility Services across National Highways

Description

Checklist:

  •     Utility Services are allowed to cross the NH either through structures or conduits especially built for this
        purpose.
  •     The casing/conduit pipe should as minimum extend from drain to drain in cuts and toe of slope to toe of
        slope in the fills and shall be designed as per the provisions of IRC and specifications of the Ministry.
  •     Application has to be made online to Highway authority with various clearances as specified.

Overview

Land being among the most precious of natural resources available, optimum utilization of land is critical in integrated development of infrastructure. One such way is to leverage land within the National Highway (NH) right of Way (ROW) for laying utility services. This is achieved through granting permissions for laying utility services along or across the ROW. How this is dependent on various factors to ensure safety and of road users and the environment. The administration of ROW has been defined in The Control of National Highways (Land and Traffic) Act 2002 and relevant rules 2004.

Process Flow:

  •     Application should be made to Executive Engineer of PWD (NH)
  •     The Application has be put in public domain for 30 days for seeking claims and objections
  •     The permission for laying of utility services is usually granted within 30 days of the closure of the public
        objections and claims

Guidelines for filling the form:

For Guidelines regarding the laying of utility services across and along national highways, Click Here

Fees:

  •     For purposes of granting license for utilising highway land, utilities have been divided into two categories:
        Public
  •     Utilities and Industrial Utilities.
  •     License Fees (Rs/sq ft/month) = (Utilized NH Land x Prevailing circle rate of lnd per square unit
        area)/10x12
  •     Fees have to be paid in advance for the period for which permission is granted.
  •     To process for granting of permission and prior to signing of lease agreement, a Performance Bank
        Guarantee for an amount based on per route meter with a validity or one year initially shall be provided by
        the utility service provider.

    For utility services such as pipes, the following rates/meter apply:

     i. Provided in the ducts already provided = Rs 50
    ii. <=300 mm diameter in width =Rs 100
    iii. >300 mm in diameter but <=1000 mm diameter in width = Rs 250
    iv. > 1000 mm = Rs 500
    v. Utility Services such as towers etc (rate in Rs/sq m) = Rs 100

Documents Required:

Safety references from respective authorities such as Directorate of Electricity, Chief Controller Explosives, Petroleum and Explosives safety Organization, Oil Industry Safety Directorate, State/Central Pollution Control Board
Index/Key Plan

How to Apply:

Application has to be made to the concerned Executive Engineer, PWD (NH)

Forms to be filled:

Sample application forms are available in this Guideline.

Whom to Contact:

For any queries regarding NOC for laying of utility services across and along National Highways in Assam, you may contact:

Mrinmoy Baruah
Executive Engineer, BRD Roads Branch
O/o the Chief Engineer, PWD (NH Works)
Assam, Chandmari, Guwahati-781003
Email: mrinmoyb1960@gmail.com

Validity From
Validity To

Is there anything wrong with this page?

To help us improve our assam.gov.in, we'd like to know more about your feedback today. It will take only 2 minutes to fill in

enter your details
enter your suggestions